Dwayne
07/22/2025, 9:34 PM✞Penclone
07/23/2025, 6:07 AMChiranjeet Mishra
07/23/2025, 7:25 PMghl_contact_get before ghl_contact_create.
- Confirm availability with ghl_check_availability before scheduling with ghl_create_event.
5. **Test Scenarios**: Perform tests using the expected date formats and ensure that calls pass the correct parameters. Confirm that the functions are called in the correct sequence as per the GHL configuration guidelines.
If you have followed these steps and the calendar still does not recognize the current date or find the calendar, there might be an underlying issue with the setup or connectivity. Consider reviewing the detailed [GoHighLevel Integration](https://docs.vapi.ai/GHL) documentation to ensure all steps are correctly implemented.